A Great Place For U
page info
memorial parkway bridge replacement 1
October 1, 2019

Union, Missouri ... Crews set beams for the new Memorial Parkway bridge.

The Memorial Parkway bridge built in 1974 had a sufficiency rating of 33.8 percent in 2014 and was in need of replacement. 

The project is the removal of the existing bridge over Flat Creek located on Memorial Drive near the fairgrounds. The work includes a new bridge, sidewalks, curb and gutter work, and a guardrail.

The bridge is expected to be closed until at least May 2020.